Skip to main content
Fig. 7 | Built Heritage

Fig. 7

From: The museum method of reusing Shanghai waterfront industrial heritage: continuation and reconstruction of urban memory

Fig. 7

Modern Art Museum before and after the renovation. A Historical photos. B Exterior view of the museum. C The waterfront elevated walkway. D First floor of the museum. E The combination of the old and new structures. F, G, H The steel suspension structure system. (Source: B/C/D by Fangfang Tian, from https://www.gooood.cn/modern-art-museum-and-its-ancillary-facilities-by-atelier-deshaus-tongji-architectural-design-group-co-ltd.htm. Accessed 10 June 2023; others from Liu 2021.)

Back to article page